TenderTiger

Private Sector | Kerala - India | PID: 194595
The Kerala Road Fund Board (KRFB) has taken over from the Public Works Department (PWD) the project to develop Thammanam-Pullepady road as a four-lane road and to extend it to M.G. Road and the NH Bypass on either side

The PWD (Roads wing) handed over files related to the project to KRFB earlier this month. This makes it the second road widening project in the district that the agency has taken over from the PWD. The first was the one to widen the 13-km-long Thripunithura S.N. Junction-Poothotta road at a cost of ?628 crore, for which the detailed project report (DPR) is ready, and land acquisition is set to begin in May

The PWD had completed survey to develop the Thammanam-Pullepady road in the third quarter of 2020. β€œThe DPR preparation is in the final stage, following which it will be handed over to KIIFB for its permission. The land acquisition process can begin once it gives the go ahead

The DPR will focus mainly on bridges that have to be widened and the design of junctions at Thammanam, Karnakodam, and Kathrikadavu. It will also shed light on whether an overbridge is needed to streamline traffic flow at the congested Kathrikadavu Junction

The junction already has a bottlenecked two-lane bridge on the four-lane Kaloor-Kadavanthra road, perpendicular to the Thammanam-Pullepady road

The permission of Railways ought to be sought to build a bridge parallel to Pullepady overbridge and the portion over the rails would have to be built under their supervision

The widening of the 3-km Thammanam-Pullepady road, its extension to Padma Junction on M.G. Road and to Chakkaraparambu on the NH Bypass are together estimated to cost around ?300 crore, including the cost of land acquisition and bridges. The road will be 22 metres wide, having a 14-metre carriageway and a metre-wide median. It will be flanked by footpaths and utility ducts. Earmarking space for cycle tracks can be considered, sources said

The list of people who surrendered their land free of cost had been handed over to the PWD by the Kochi Corporation

The KIIFB is expected to take a call on whether to provide them compensation or to offer them relaxations while constructing buildings. The four-km road can be developed within a year of commencement of works, they added

| Updated on: 22 - Feb - 2021
Search Tenders By Product: Road Project
To view this paid Project you can either "Buy this Project" or subscribe our annual Project Alert Service and get access to all similar Projects. If you are registered member, please fill in the subscription form below . If not, please Register first.
Step 1 - Select a plan
Select Plan Unit Rate Subscription Validity
Rs. 29500 /-
Step 2 - If registered user, please fill below form
(*) Mandatory fields
Email Id *
States Interested In
Projects Interested In
Select Payment Type
Verification Code *
Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Limited to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.