TenderTiger

State Government | Maharashtra - India | PID: 194597
Maharashtra Chief Minister Uddhav Thackeray laid the foundation stone of Sewri-Worli Elevated Corridor (SWEC) and inaugurated C-arm of the flyover at Kalanagar Junction and other developmental works on 21 February 2021

The Mumbai Metropolitan Region Development Authority (MMRDA) is implementing six-lane Mumbai Trans Harbour Link Project (MTHL) having a length of 22 km

The total length of the Sewri-Worli Elevated Corridor is about 4.5 km and will cater to four-lane traffic coming from MTHL Project

Administrative approval for the project amounting to Rs 1,276 crore has been accorded in 147th meeting of the Mumbai Metropolitan Region Development Authority (MMRDA) Authority

The Maharashtra Coastal Zone Management Authority (MCZMA) and the Maharashtra State Environment Impact Assessment Authority (SEIAA) accorded approval to the project in their 145th meeting of MCZMA held on 7 July 2020 and 205th meeting held on 8 September 2020 respectively

In a move to decongest the Kalanagar Junction, the construction of flyover was proposed by the MMRDA and the work contract was awarded on 2 February 2017

In this project, a two-lane flyover from Bandra Worli Sea Link towards Bandra Kurla Complex (BKC) of about 715 mtr long (B-arm) and two-lane flyover from BKC to Bandra Worli Sea Link of about 604 mtr (C-arm) is proposed. Moreover, a two-lane free left arm flyover having length of about 310 mtr is proposed from Dharavi to Worli Sea Link (D-arm)

The CM also inaugurated a cycle track as part of the project of the refurbishment of footpaths and road junctions in the G block of BKC. This is a pilot project and bifurcated into two phases. The tendered cost for Phase-1 is Rs 18.11 crore and Phase-2 is Rs 14.12 crore

The project includes improving eight junctions and in-between streets at G-Block of BKC to have enhanced facilities like a protected cycle track, clutter-free pedestrian realm. Of the total scope, four junctions and streets between them are planned to be completed by April 2021

Apart from this, smart parking at BKC was also inaugurated. Owners of the vehicles can book their parking space minimum three hours before parking of the vehicle through mobile app and also website in the nearest parking slot in BKC

In the parking slot, minimum three e-bikes would be available for the movement of vehicle owners for moving in the surrounding area of about three km from parking slots after parking of the vehicle

| Updated on: 22 - Feb - 2021
Search Tenders By Product: Bridge Project
To view this paid Project you can either "Buy this Project" or subscribe our annual Project Alert Service and get access to all similar Projects. If you are registered member, please fill in the subscription form below . If not, please Register first.
Step 1 - Select a plan
Select Plan Unit Rate Subscription Validity
Rs. 29500 /-
Step 2 - If registered user, please fill below form
(*) Mandatory fields
Email Id *
States Interested In
Projects Interested In
Select Payment Type
Verification Code *
Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Limited to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.